Compare timber fence types
Single paling, lap & cap, lapped only and hardwood, side by side.
Compare
Eight steps from your first message to a finished fence, with a free measure in the middle and no surprises at the end.
Use the quote form or call. The useful things to have ready are the rough length in metres, the height you want, how many gates, and whether an old fence needs to come out. Photos of the boundary help more than anything else.
Not sure of the length? Pace it out — one comfortable stride is close enough to a metre for a first estimate.
We come back to you with an estimate based on what you have described and what we can see in the photos. If something in the description will change the price significantly — a retaining wall, poor access, a shared boundary — we tell you at this point rather than at the end.
If the estimate is in the range you expected, we come out and measure properly. This is free and there is no obligation. We check the ground, the access, the existing fence, where the gates want to be, and any levels that affect how the fence is set out.
This is also when you can ask the questions that are hard to answer over the phone.
You get a firm quote against the measured job, and an estimated start date. Nothing is ordered and nothing happens on site until you say yes.
Existing fencing and brick walls can be removed and disposed of. Old palings, rails, posts and footings come out and go with us. If a section needs to stay up for a dog or a pool, tell us and we stage the work around it.
Each post is set 600mm deep into the ground, secured with at least one full 20kg bag of concrete per post. Posts can be filled with concrete up to one third of their length for extra strength. Posts are set to a string line so the fence runs true, and gate posts are sized for the gate they will carry.
Timber posts or 65mm × 65mm steel posts, depending on the fence and the site.
Rails go on, then the palings in the style you chose — single paling, lap & cap, lapped only or hardwood. Gates are built and hung to suit the opening, with the hardware sized for the leaf.
Offcuts, old material and spoil leave with us. We walk the finished line with you before we go so anything you are not happy with gets sorted on the spot.
Add a few photos of the boundary — including the ends and any slope — and the estimate you get back will be close to the final quote.
Get a Free Measure & QuoteNo. The site measure and the quote are free, and there is no obligation to go ahead afterwards.
A standard 30 metre timber fence, including demolition and removal of the existing fence, typically takes 1 to 3 days. Longer runs, difficult access, retaining work and multiple gates all add time, and weather can move a start date.
Not usually, as long as we have access to the boundary and somewhere to work. We will let you know if there is a decision that needs you on site, such as exactly where a gate should swing.
Boundary fences are generally a shared matter between neighbours in NSW, including how the cost is handled. We can quote the work either way, but the agreement itself is between you and the adjoining owner. It is worth having that conversation before we start.
Yes, but tell us before the measure so it can be planned. Pool areas in particular need care, because temporary fencing or staging may be needed while the old fence is out.
Single paling, lap & cap, lapped only and hardwood, side by side.
CompareThe factors that move the price, explained without invented per-metre rates.
Read guidePhotographs of fences and gates we have built across Sydney.
View projects
Send the length, height and a few photos. You will get an estimate first, then a free measure before anything is locked in.
NSW Fencing Licence 269038C · ABN 76 612 245 594