Timber Fence Replacement
Removing a fence that has reached the end of its life and building its replacement, handled together so there is no gap in the boundary and no leftover mess.
View service
Supply and installation, not supply only. The fence is set out, dug, concreted, built and cleaned up by the people who quoted it.
The full job: measure, remove the old fence if there is one, set out the line, dig and concrete the posts, fix the rails and palings, hang the gates and clean up.
Every timber fence comes down to three things done properly: the posts, the line and the finish. Posts carry the fence, the line is what you notice from the street, and the finish is what makes it look considered rather than thrown up.
Fences are built using timber posts or 65mm x 65mm steel posts. Steel posts are often chosen for longer runs, taller fences and gate posts, because those are the positions carrying the most load.
Whichever is used, the post depth and the concrete stay the same: 600mm deep, at least one full 20kg bag of concrete per post.
Common finished heights are 1.5m, 1.8m, 2.1m and 2.4m. Timber fencing is built up to a maximum height of 2.4m.
1.8m is the usual height for a residential side or rear boundary. What is appropriate for your fence depends on ground levels, any existing retaining, and what applies to your property, which is why it is confirmed at the site measure rather than over the phone.
A standard 30 metre timber fence, including demolition and removal of the existing fence, typically takes 1 to 3 days.
Longer runs, difficult access, rock, sloping ground, retaining work and multiple gates all extend that. The site measure is where the real duration gets worked out.
Two fences of the same length can be very different jobs. These are the things that change the work:
Photographs from our own jobs across Sydney.
Newly installed treated pine timber paling fence running along a residential boundary beside a two-storey home in Northmead, Sydney
Treated pine timber fence part-way through installation at a property in Toongabbie, Sydney
Treated pine timber fence enclosing a freshly cleared and levelled block in Sydney
Treated pine timber fence stepped down sloping ground alongside excavated steps in Windsor, Sydney
Long treated pine timber fence built along a driveway and carport boundary at a Sydney property
Each post is set 600mm deep into the ground and secured with at least one full 20kg bag of concrete. Posts can also be filled with concrete up to one third of their length for extra strength.
A standard 30 metre timber fence, including demolition and removal of the existing fence, typically takes 1 to 3 days. Access, ground conditions, slope and gates all affect the actual time.
Timber fencing is built up to a maximum height of 2.4m. Common heights are 1.5m, 1.8m, 2.1m and 2.4m.
Both. Fences are built with timber posts or 65mm x 65mm steel posts. Steel is often used for longer runs, taller fences and gate posts.
Removing a fence that has reached the end of its life and building its replacement, handled together so there is no gap in the boundary and no leftover mess.
View serviceTaking out an existing fence or brick wall, dealing with the footings, and removing the material from site.
View serviceTimber sleeper retaining walls in H4 treated pine to Australian Standard grading, built to hold a change in ground level.
View service
Send the details and a few photos of the site. You will get an estimate based on what is actually there, and a free on-site measure before any work starts.
NSW Fencing Licence 269038C · ABN 76 612 245 594