Newly installed treated pine timber paling fence running along a residential boundary beside a two-storey home in Northmead, Sydney
Service

Timber Fence Installation

Supply and installation, not supply only. The fence is set out, dug, concreted, built and cleaned up by the people who quoted it.

The full job: measure, remove the old fence if there is one, set out the line, dig and concrete the posts, fix the rails and palings, hang the gates and clean up.

How a timber fence is built

Every timber fence comes down to three things done properly: the posts, the line and the finish. Posts carry the fence, the line is what you notice from the street, and the finish is what makes it look considered rather than thrown up.

  • The boundary is walked and measured, and the fence line is set out before anything is dug.
  • Posts are dug and set 600mm deep, each secured with at least one full 20kg bag of concrete.
  • Where extra strength is wanted, posts can be filled with concrete up to one third of their length.
  • Rails are fixed between the posts, sized and spaced for the finished height.
  • Palings are fixed to the rails, kept plumb and worked to a consistent top line.
  • Gates are hung and adjusted, and the site is cleaned up with offcuts and old material taken away.

Posts: timber or steel

Fences are built using timber posts or 65mm x 65mm steel posts. Steel posts are often chosen for longer runs, taller fences and gate posts, because those are the positions carrying the most load.

Whichever is used, the post depth and the concrete stay the same: 600mm deep, at least one full 20kg bag of concrete per post.

Heights

Common finished heights are 1.5m, 1.8m, 2.1m and 2.4m. Timber fencing is built up to a maximum height of 2.4m.

1.8m is the usual height for a residential side or rear boundary. What is appropriate for your fence depends on ground levels, any existing retaining, and what applies to your property, which is why it is confirmed at the site measure rather than over the phone.

How long it takes

A standard 30 metre timber fence, including demolition and removal of the existing fence, typically takes 1 to 3 days.

Longer runs, difficult access, rock, sloping ground, retaining work and multiple gates all extend that. The site measure is where the real duration gets worked out.

What affects the job on site

Two fences of the same length can be very different jobs. These are the things that change the work:

  • Whether an existing fence has to come out first, and what its footings are like
  • Ground conditions: rock, fill, soft ground, tree roots and services
  • Slope across the fence line, which decides whether the fence steps or rakes
  • Existing retaining or block walls the fence has to sit above
  • Access to the fence line for material, particularly narrow side paths and locked rear yards
  • The number of gates and how wide they are

Fence Installation — our work

Photographs from our own jobs across Sydney.

  • Newly installed treated pine timber paling fence running along a residential boundary beside a two-storey home in Northmead, Sydney

  • Treated pine timber fence part-way through installation at a property in Toongabbie, Sydney

  • Treated pine timber fence enclosing a freshly cleared and levelled block in Sydney

  • Treated pine timber fence stepped down sloping ground alongside excavated steps in Windsor, Sydney

  • Long treated pine timber fence built along a driveway and carport boundary at a Sydney property

Fence Installation questions

How deep are fence posts set?

Each post is set 600mm deep into the ground and secured with at least one full 20kg bag of concrete. Posts can also be filled with concrete up to one third of their length for extra strength.

How long does it take to install a timber fence?

A standard 30 metre timber fence, including demolition and removal of the existing fence, typically takes 1 to 3 days. Access, ground conditions, slope and gates all affect the actual time.

What is the maximum height for a timber fence?

Timber fencing is built up to a maximum height of 2.4m. Common heights are 1.5m, 1.8m, 2.1m and 2.4m.

Do you use timber or steel posts?

Both. Fences are built with timber posts or 65mm x 65mm steel posts. Steel is often used for longer runs, taller fences and gate posts.

Treated pine timber fence part-way through installation at a property in Toongabbie, Sydney
Free site measure & quote

Get fence installation quoted

Send the details and a few photos of the site. You will get an estimate based on what is actually there, and a free on-site measure before any work starts.

NSW Fencing Licence 269038C · ABN 76 612 245 594

Call Free Measure & Quote