How to choose a timber fence
There is no single best timber fence. There is a best fence for your boundary, and the honest way to get to it is to work through what the fence actually has to do.
6 min read
We do not publish per-metre prices, and any timber fencing website that does is quoting a fence it has not seen.
What we can do is be completely transparent about what moves the number, so you can work out roughly where your job sits and what to mention when you ask for a quote.
Two 30 metre fences can be very different jobs. One is a flat back boundary with a wide driveway beside it and no old fence to remove. The other steps down a slope, sits above a block wall, has an old fence with substantial concrete footings, and is reached down a 900mm side path with four steps.
Same length. Very different work. A single rate per metre hides that difference, which is why the number quoted over the phone so often is not the number on the invoice.
Roughly in order of how much they matter:
Access and the old fence. These two account for most of the gap between what people expect and what a job actually involves.
A rear yard reached only by a narrow path and steps changes every part of the job, because every paling, every post, every bag of concrete and every piece of old fence goes in and out by hand.
And old footings vary enormously. Some lift out. Some have to be broken out. Some sit exactly where a new post needs to go.
The more accurately you describe the job, the more useful the first response is.
It runs in two stages, which is deliberate.
A timber fence is materials plus labour, and the split is not always what people assume. Posts, concrete, rails and palings are real costs, but so is the labour of removing an old fence, digging in ground that fights back, and carrying everything in and out of a site.
That is why the same materials on two different properties do not cost the same to install, and why the site measure is not a formality.
We will not quote a price on this page. Not a range, not a from-price, not a per-metre rate.
A number published here would be either so wide as to be useless or so specific as to be wrong for most properties, and either way you would end up with a different figure after the measure. Which is the exact problem people complain about.
It depends on length, height, fence style, the number and size of gates, whether an existing fence has to be removed, access to the fence line, and ground conditions. We do not publish per-metre prices because they hide those differences. The site measure and quote are free.
Because a phone price ignores the things that change the job most, particularly the old fence and the access. You can get an initial estimate from measurements you provide, then a site-verified estimate after a free on-site visit.
Single paling in treated pine uses the least material for a given length. Lapped only sits in the middle. Lap & cap uses the most treated pine. Hardwood is a more expensive material than treated pine.
Removal and disposal of the existing fence is quoted as part of the job when it is needed. It is real work, because both the fence and its footings have to come out and be taken away.
Work usually starts within 1 to 2 weeks of a deposit being received, and materials are usually delivered within 2 to 3 days.
There is no single best timber fence. There is a best fence for your boundary, and the honest way to get to it is to work through what the fence actually has to do.
6 min readYou do not need to be precise. You need to be roughly right, and you need to describe the shape of the job correctly.
4 min readMost timber fencing work in Sydney is replacement, not new. Which means the first real question is not what fence you want, it is whether you actually need a new one.
5 min read
Once you know what you want, Jye Fulton will measure the boundary and quote it. There is no charge for the visit.
NSW Fencing Licence 269038C · ABN 76 612 245 594